|
Lawson Butzkopfski (or Boskovsky) Billinton (4 February 1882 – 19 November 1954) was the Locomotive Engineer of the London, Brighton and South Coast Railway from 1912 until the company became part of the Southern Railway in 1923. He joined the LBSCR in 1900 as an apprentice. By the end of 1907 he was a district locomotive superintendent at the railway works at New Cross. From February 1911 Billinton was locum tenens, or caretaker, for Locomotive Engineer D. E. (Earle) Marsh at Brighton works whilst Marsh was on leave of absence due to ill health. Earle Marsh resigned in July 1911. Billinton was promoted to Locomotive Engineer at the beginning of 1912. In 1917 Billinton was commissioned as a temporary Lieutenant Colonel in the Royal Engineers, and he served on military missions to Romania and Russia. He retired from the SR aged 40 in 1923, taking up fruit farming at Bolney in Sussex. Billinton died in 1954 at Lyme Regis in Dorset. ==Early career== Lawson Billinton was born in Brighton, the third son of R. J. Billinton, who later became the LBSCR's Locomotive Engineer in 1890. His mother was of Polish origin and his middle name Butzkopfski (sometimes spelled Boskovsky) was her family name. He became a pupil of his father at Brighton works in January 1900. He was a fitter's apprentice from September 1900. In February 1903 he was promoted to draughtsman, and promoted again in September 1903 to inspector of materials. In September 1904 he became assistant foreman at New Cross. R. J. Billinton died in office in November 1904, and was succeeded as Locomotive Engineer by D. E. (Earle) Marsh. Earle Marsh placed Lawson Billinton in charge of all experimental work on the LBSCR's locomotives and rolling stock, including the trials of the new Marsh Atlantics. In January 1906 Billinton was transferred to Brighton as assistant outdoor superintendent, moving back to New Cross in February 1907 and becoming district locomotive superintendent in July of that year. The reconstruction of Brighton works under Marsh caused tremendous difficulties in maintaining and repairing the LBSCR's locomotive stock. Some major repairs and boiler changes began to be carried out at New Cross under Billinton's supervision, but this had little effect on the situation. By 1910 about 30% of the locomotive stock was out of traffic and awaiting repair, and the number of engine failures in service increased substantially in the second half of that year, for which Marsh was held responsible by the directors of the company. Because Earle Marsh was in poor health he was given leave of absence until 30 June 1911, and Billinton was instructed to take general charge of Brighton works as Marsh's locum tenens or caretaker from 15 February 1911.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「L. B. Billinton」の詳細全文を読む スポンサード リンク
|